Susan

April 29, 2019

GA-216-2016 Pose Et Finition Des Panneaux De Gypse

French translation of  GA-216-2016 Application and Finishing of Gypsum Panel Products provided as a PDF download. GA-216 is referenced in the International Building Code as an appropriate standard […]
April 29, 2019

GA-222-14 Reparación De Tornillos o Clavos Sobresalidos

This Spanish translation of GA-222-14 Repairing Screw or Nail Pops describes the symptoms, causes, and repair methods for fastener pops in gypsum panel products.
April 26, 2019

GA-225-2015 Reparación De Sistemas De De Paneles De yeso Resistentes Al Fuego

Spanish translation of GA-225-2015 Repair of Fire-Rated Gypsum Panel Product Systems. How to repair a damaged wall and maintain the system’s fire-rating. Addresses repairs of all […]
April 26, 2019

GA-220-2016 Recomendaciones Para La Instalación De Paneles De Yeso En Invierno

Spanish translation of GA-220-2016 Gypsum Board Winter Related Installation Recommendations. Learn how to avoid problems associated with cold weather. Get it now.
April 26, 2019

GA-216-2016 Colocación y Acabado de Paneles de Yeso

Spanish translation of  GA-216-2016 Application and Finishing of Gypsum Panel Products provided as a PDF download. GA-216 is referenced in the International Building Code as an appropriate […]
April 26, 2019

Gypsum Area Separation Firewalls and Utility Placement

The Gypsum Association has published a position document on Gypsum Area Separation Firewalls intended to clarify the criteria for the placement of utilities in the flanking […]
April 11, 2019

GA-600-2018 Fire Resistance and Sound Control Design Manual

Since 1973, model building codes such as the IBC and the NEC have referenced the GA-600 Fire Resistance and Sound Control Design Manual as a primary […]
April 11, 2019

GA-620-2019: Gypsum Area Separation Firewalls

Provides a comprehensive look at gypsum area separation firewall systems. Get it now.
April 11, 2019

GA-231-2019 Assessing Water Damage to Gypsum Board

Guidance on determining whether gypsum board needs to be replaced after exposure to water from all sources. Addresses all project phases from transportation to installed use. […]